To run network wiring to 4 classrooms in three schools.
Room 21Emily Spong:
Room 23
Room 25
Room 29
Room 6Churchland Academy:
Room 7
Room 8
Room 9
Room 103
Room 104
Room 105
Room 106
NETDAY 96 is a ground breaking ceremony in Portsmouth Public Schools, and a total of 12 classrooms divided between 3 schools were selected based on resources available. These three schools will be the start of an initiative to network all computers and classrooms in the school system. As more resources become available, more computers and schools will be networked. With careful planning and design, these networks will service the school systems needs for many years to come.
Materials:
* Please see the task list attached to this document for a list of work to be completed for your school.
- 4 boxes of category 5 UTP communications cable (Plenum rated where required)
- 18 ft. of non-metallic channel duct (wiremolding) for each room.
- Single gang outlet box for each room.
- 90 degree elbows (to be used if needed)
- Channel duct splice covers (to be used if needed)
- Category 5 faceplate for each room.
- Ladders for each school.
- Assorted hand tools (scredriver, pliers, cutters) for each school.
- Markers for each school.
- Any other materials provided by volunteers, or school system employees.
- Open ceiling tiles as needed to gain access to pre-drilled holes and wiring paths.
- Run category 5 back bone cable from existing hub to library work room.
- Run category 5 cable from workroom to room 6.
- Run category 5 cable from workroom to room 7.
- Run category 5 cable from workroom to room 8.
- Run category 5 cable from workroom to room 9.
- Install wiremolding and box near video outlet in room 6.
- Install wiremolding and box near video outlet in room 7.
- Install wiremolding and box near video outlet in room 8.
- Install wiremolding and box near video outlet in room 9.
- Close all ceiling tiles that were opened to gain access to wiring paths and holes.
- Clean up any mess or trash made during installation process.